Satisfaction with highways maintenance

Our goal is
Actual
Target
Goal

Satisfaction with highways maintenance is determined through the National Highways & Transport annual survey. This report allows Central Bedfordshire to compare its performance with other local authorities. Since the survey began in 2010, there has been a 6% increase in satisfaction. The target was missed by 2% in 2015 and 2016.

For 2017, the Central Bedfordshire result was just 1% lower than the target of 53%.

Bigger values are best